Mobile
Log In Sign Up
Home > chinese-english > "pouring process" in English

English translation for "pouring process"

浇注法
铸模地坑


Related Translations:
pouring:  浇铸, 浇注浇铸,浇注浇注
pouring sealant:  灌封胶
pour points:  倾点, 流点
pouring height:  注入高度
pour toi:  不可承受之美丽只为你
stopper pouring:  拔塞浇注
pour back:  申而有
pouring disc:  盘形外浇口
pouring device:  浇铸装置
pouring aisle:  浇注跨铸锭跨
Example Sentences:
1.The computing model is optimized according to the model board trolley installation form and the concrete pouring process
根据现场测量时模板台车的结构安装形式和混凝土浇注的施工步骤,反复修整完善计算模型。
2.Because the changes of the concrete structure dynamics properties will happen during pouring process , the responses are the transient responses
由于混凝土的力学特性随施工龄期变化,导致响应的时变性,如弹性模量。
3.Using proper baking and pouring process for plaster mold , the castings with qualified size and good surface quality could be obtained
在此基础上,对工作石膏型采用合理的烘烤和浇注工艺,得到了尺寸合格、表面质量好的铸件。
4.Abstract : the pouring process of the beer pouring production line was analyzed in this paper , brought about the intelligent control for constant of beer and get to a fine control results by means of pressure sensor
文摘:本文分析了啤酒灌装生产线的啤酒充装过程,提出用压力传感器,实现对啤酒恒量灌装的智能控制,获得较好的控制效果。
5.The epc process used for producing of cast iron grinding balls was introduced including : chemical composition of grinding balls , melting process , production of eps patterns and ball patterns assembling process , pouring process , as well as equipment and investment
摘要介绍消失模铸造磨球的化学成分、熔炼工艺、磨球生产工艺流程、 eps模的制作和组串工艺,浇注工艺,以及设备和投资。
6.The surface cracks of concrete dam in the fengman projects were surveyed and detected with non - damage detection methods in the fields . the pouring process of the concrete was simulated with finite element method , and then the stress distribution in the dam was computed
对丰满大坝溢流坝段新浇混凝土裂缝进行了现场调查、无损性态检测;采用有限元法模拟浇筑过程中混凝土内的应力分布。
7.The casting dimension accuracy reached ct10 class and even higher b adopting following measures : controlling foaming agent content , strictly controlling pattern manufacture , patterns welding and assembling , filling sand and moulding , as well as controlling pouring process
采用控制发泡剂含量和严格模样制作、粘结和组模工序、填砂造型工序和浇注工序中各关键技术措施,使产出的铸件尺寸精度达到了ct10级以上。
8.We adopt the semi continuous pouring process and mainly manufacture the products marked 1xxx 3xxx 4xxx 7xxx 8xxx and the like by means of 1500 hot - rolling mill , 1400 cold - rolling mill , 1400 mill of aluminum strip and foil , 800 roughing or finishing aluminum foil mill
产品介绍本公司采用半连续浇铸工艺,经1500热轧机, 1400冷轧机, 1400铝带箔轧机及800铝箔粗中精轧机等铝材,主要生产1xxx , 3xxx , 4xxx , 7xxx , 8xxx等系列牌号。
9.Fabrication of the box beam is divided into such parts as reinforcement , formwork , concreting , prestressing , moving and storing of beam , pipe grouting under pressure , end sealing of the beam , water - proof layer on the bridge surface system , protective coating etc . the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects , such technologies as : manufacturing and fixing of reinforcement , steel reinforcement fixing baseplate , web plate and top plate respectively and lifting the steel skeleton into form , requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork , optimization of concrete ratio , concrete pouring process of two ends of beam in priority over the middle , in sequence of first baseplate followed by web plate and top plate at last , concrete pouring in inclined section and in horizontal layer , concrete vibration mainly by external vibrator in assistance with internal vibrator , methods and regulation for steam curing of concrete , dual controls over stress and strain to ensure quality of prestressing workmanship , construction method of effective beam moving by heavy - weight special moving facility , some regulations and key notes about construction of grouting under pressure , beam ends sealing , water - proof layer on the bridge surface system , protective coating
箱梁制造由钢筋工程、模板工程、混凝土工程、预应力工程、移存梁工程、孔道压浆工程、梁体封端工程、桥面防水层和保护层工程等施工环节组成。文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。
10.The defect of crack in the engine block of 8170 diesel engine has beem researched and analyzed , which can be solved and avoided through the following measures : optimizing the structure of engine block casting , improving alloying technology , perfecting pouring process and adopting normal inoculation before furnace and metal - stream inoculation during the period of pouring
摘要对8170缸体裂纹缺陷进行了探讨分析,通过优化铸件结构,改进合金化工艺,完善浇注工艺以及随流孕育与炉前孕育工艺相结合等措施,使裂纹缺陷解决。
Similar Words:
"pouring position" English translation, "pouring pot" English translation, "pouring practice" English translation, "pouring pressure" English translation, "pouring procedure" English translation, "pouring rain" English translation, "pouring rate" English translation, "pouring reel" English translation, "pouring refractory" English translation, "pouring sealant" English translation